New Entrance Canopy

Haywood Hospital

The works to the Haywood Hospital were to construct a new main entrance canopy following the accidental demolition of the existing canopy. The new canopy has been redesigned to prevent any overhang onto the roadway to reduce the risk of accidental damage in the future.

The construction of the new canopy required excavation and construction of new foundations, erection of steel structure complete with weatherproof roof and installation of both general and aesthetic lighting. Damage to existing glazed wall and rainwater pipework was also repaired during the course of the project.

Project Details

Location Stoke-on-Trent, Staffordshire
Client SODEXO – Healthcare – Hard FM
Value £76,000.00
Project type Healthcare

Get in Touch

At Trenton Construction, we believe that there is no job too big or too small for our Team. Please feel free to contact us for any enquiry.

Latest Projects

12

Mucklestone St. Mary Church

St Mary’s Church Boundary Wall Repairs

20220512 075415405 iOS

Linear Accelerator 4

Enabling Works for LINAC 4 Replacement

2

Haywood Hospital

New Entrance Canopy